Capacity Market: How To Earn Income From Your Battery Setup

Thomas Hayes

Your business could earn money by agreeing to keep its battery ready to supply electricity when Great Britain’s electricity supplies come under pressure. Through the Capacity Market, you receive payments for keeping that promise, even if you never need to use the battery for the scheme.

Your business could earn money by agreeing to keep its battery ready to supply electricity when Great Britain’s electricity supplies come under pressure. Through the Capacity Market, you receive payments for keeping that promise, even if you never need to use the battery for the scheme.

In this article, find out how the Capacity Market works, what taking part involves and how much your business could keep after fees and costs.

What is the Capacity Market?

The Capacity Market is a government scheme that pays companies to keep equipment like batteries and generators ready to supply electricity or reduce demand during a serious shortage.

For example, on a cold evening, homes and businesses may use more electricity while low wind limits output from wind farms. The government arranges capacity ahead of time so enough equipment can supply electricity or reduce demand in situations like this.

Your business could contribute by using its battery to power machinery, lighting or other equipment that normally runs on grid electricity. That means you take less from the grid, leaving more electricity available for other users.

The National Energy System Operator, or NESO, runs the entry checks and auctions for the scheme across Great Britain. In these auctions, companies compete for agreements to keep equipment available in a future year.

You’ll usually take part through an energy aggregator, a company that groups your battery with equipment at other businesses and manages participation on your behalf.

Your battery may be too small to meet the scheme’s minimum entry size on its own. By combining several sites, the aggregator can offer enough power for the group to qualify. It also handles registration, bidding, meter records and payments, so you don’t need staff to manage that work.

What trades are available through the Capacity Market?

You can earn money by keeping equipment available to supply electricity or reduce the amount it takes from the grid when demand outstrips supply. This could involve:

What your business offersHow it works at your site
Use stored electricity to power your building.Your battery supplies machinery, lighting or other equipment, so your business takes less electricity from the grid.
Supply electricity to the grid.Your battery or generator sends electricity to the grid, provided your connection agreement and the scheme’s rules allow it.
Temporarily use less electricity.Your business pauses suitable equipment or runs it at lower power, reducing how much electricity it takes from the grid.

Your aggregator checks which of these options your site can qualify for and how much it can contribute.

The payments you receive are for keeping that equipment available, even if no shortage occurs and you never need to use it for the scheme.

What does a Capacity Market agreement look like?

Capacity Market agreements set out how much power your group must keep available to supply electricity or reduce grid use during a serious shortage, when it must provide it, and the payment rate for keeping that power available.

Let’s use an example. Say your aggregator enters your battery and those at nineteen other businesses into an auction. Here’s what happens if the group secures an agreement.

What does your aggregator agree to provide?

Let’s say your battery and those at nineteen other businesses qualify together to enter 1,000 kilowatts (kW), or one megawatt (MW), into an auction, through your aggregator.

Together, all these batteries might have a combined maximum power of 2 MW, but NESO may count only part of that towards the agreement. That’s because, if they counted it all, the batteries could run out of stored electricity before the end of the shortage NESO wants to cover.

NESO applies a percentage called a de-rating factor. In this example, we’re assuming that rate is 50%, so the group’s 2 MW becomes 1 MW for the auction. The scheme calculates payments using that 1 MW.

During the auction, the price falls in rounds. Your aggregator specifies the lowest payment rate it will accept and withdraws the group if the price falls below that level.

If the group is still in the auction when it ends, it secures an agreement at the final rate. This is called the clearing price. It’s the amount the scheme pays for each kilowatt kept available for a year. Your group’s payment therefore covers 1,000 kW at that rate.

Think of this like NESO providing a backstop for itself. Through this one-year agreement, your aggregator agrees that the group will use its batteries to supply its buildings during a serious shortage, reducing the electricity those businesses take from the grid. In return, the scheme pays for keeping that battery power available throughout the year.

Note: NESO normally holds these auctions every year. In a T-4 auction, companies bid to keep equipment available about four years later. A T-1 auction takes place about one year ahead, so NESO can secure any extra power still needed. The numbers refer to how far ahead companies bid, rather than how long their agreements last.

What happens if electricity supplies run short?

NESO issues a Capacity Market Notice when it forecasts a higher risk of a serious shortage. It normally issues those around four hours ahead.

Your aggregator monitors these notices and prepares the batteries under the arrangements you’ve agreed.

If the shortage becomes serious enough that NESO has to order restrictions on electricity use, it may qualify as a System Stress Event. When this happens, your aggregator arranges for the batteries to supply their buildings when needed. This means your machinery, lighting and other equipment then take less electricity from the grid, but not in a way that interrupts your business operations.

If no serious shortage develops, your aggregator may not need to use the batteries for the scheme. But you still receive your agreed payment for keeping them available.

How do you get paid, and how is delivery checked?

The scheme pays participants once a month, including your aggregator, throughout the delivery year. When the payment gets to your aggregator, they deduct their amount and pass on what they agreed to you.

When there is a System Stress Event, your aggregator submits meter records showing how much electricity each business took from the grid.

EMR Settlement, which handles the scheme’s payments, compares those readings with an estimate of what each business would have taken without using its battery. It builds these estimates, known as a baseline, from earlier meter records.

For example, suppose your business’s baseline is 100 kW. During the shortage, your battery supplies part of your building’s electricity and your grid use falls to 50 kW. The records show a reduction of 50 kW.

If the group doesn’t provide enough electricity or reduce grid use by enough, the company holding the agreement can face a penalty. Your contract with the aggregator will set out whether it can deduct any of that cost from your payment or charge you separately.

How much could your business earn from the Capacity Market?

Below, find three examples of an aggregator which has twenty businesses sharing a 1,000 kW agreement equally, including you. At an assumed price of £20 per kW per year, the group receives £20,000 over the delivery year. The aggregator deducts a 20% fee from each business’s share.

Note: All prices and fees are assumed. They aren’t current auction prices, GridVolt terms or earnings forecasts. Each business spends an assumed £10 on extra electricity for the required performance checks and preparation during the year. The group meets its obligations, with no penalties or additional payments for exceeding them.

1. The business earns a payment without a shortage occurring

You have enough spare battery power and stored electricity to take part without giving up your usual battery savings from storing solar electricity or charging at cheaper rates for use when grid electricity costs more. There are no System Stress Events during the year.

CalculationAmount
Group’s annual payment1,000 kW × £20 = £20,000
Business’s equal share£20,000 ÷ 20 = £1,000
Aggregator’s 20% fee−£200
Payment to the business£800
Extra electricity for performance checks and preparation−£10
Business is better off over the year by£790

You keep £790 after its fee and extra electricity costs, even though no serious shortage occurs.

2. The battery supplies the building during a shortage

As before, you have stored electricity that you’re keeping available for the scheme and don’t need for your own use.

During a System Stress Event, the aggregator arranges for your battery to supply 50 kW to supply power to your site for two hours, meaning you buy 100 kWh less from the grid, meeting the site’s agreed contribution. Afterwards, the battery recharges to replace what it supplied. Electricity costs 20p per kWh throughout. We assume that, for every 10 kWh bought for charging, the battery supplies 9 kWh after charging and discharging losses.

CalculationAmount
Annual payment after the aggregator’s fee£800
Extra electricity for performance checks and preparation−£10
Electricity purchases avoided during the shortage100 kWh × £0.20 = +£20
Electricity bought to replace the battery charge100 ÷ 0.90 = 111.11 kWh
Cost of recharging111.11 kWh × £0.20 = −£22.22
Business is better off over the year by£787.78

You save £20 on grid electricity during the shortage but spend £22.22 recharging afterwards. The £2.22 difference covers electricity lost during charging and discharging.

You get the same annual payment because using the battery during the shortage doesn’t automatically mean you receive extra.

3. Keeping electricity available means giving up larger bill savings

Your business normally uses 100 kWh from its battery when grid electricity costs 30p per kWh, which it then replaces by charging overnight at 10p per kWh. You have arranged with the aggregator to keep those 100 kWh in reserve on fifty days during the year. On these days, you buy electricity from the grid instead and can’t recover the missed savings by using the stored electricity at another time.

For this example, no System Stress Event occurs. The battery has the same 90% charging and discharging efficiency as in the previous example.

CalculationAmount
Grid electricity the battery normally replaces each day100 kWh × £0.30 = £30
Cost of replacing that battery charge overnight100 ÷ 0.90 × £0.10 = £11.11
Bill saving normally made each day£30 − £11.11 = £18.89
Bill savings given up over fifty daysAbout £944.44
Annual payment after the aggregator’s fee+£800
Extra electricity for performance checks and preparation−£10
Business is worse off over the year by£154.44

You still get £800 but give up more than that in bill savings, plus the £10 on electricity for checks and preparation.

An aggregator would be highly unlikely to recommend this arrangement once it had worked out that you’d lose more in bill savings than you’d receive in payments. Your aggregator could instead look at other electricity markets where your battery could earn money while keeping more of its usual bill savings.

How can your business take part in the Capacity Market?

Take the following three steps to see if your business can trade in the Capacity Market:

1. Find an aggregator to assess your site

Give the aggregator details of your battery and inverter, your electricity tariff and recent meter readings. Half-hourly readings are best, as they show how much electricity your business takes from the grid during each 30-minute period.

They’ll then assess:

  • How much power your battery can supply to your building and for how long.
  • Whether its control software works with your battery and inverter.
  • Whether your meters can provide the records needed to check delivery.
  • How much your site could contribute after the scheme’s entry checks and de-rating.

Ask which company would hold the group’s Capacity Market agreement and which delivery year it plans to enter. Remember that aggregators need to be awarded a contract to supply to this market and there is no guarantee that an aggregator you join will either win or retain an agreement.

2. Agree how much electricity to keep for your own work

Tell your aggregator when your business needs to use electricity it’s got stored in its batteries and how much power you must keep in reserve. If you have solar panels, explain what times of day you need space in the battery to store their electricity.

The aggregator also checks:

  • Your battery’s operating limits and warranty conditions.
  • How much power your site can take from or send to the grid.
  • Any restrictions your local network operator can impose.
  • Other trading or flexibility services you already use.

You then agree how much battery power the aggregator can include in its bid. Get assurances from it on how it will keep enough electricity available to power your site during a shortage while keeping the battery savings you expect.

Your aggregator should explain how it monitors Capacity Market Notices, controls your battery during a shortage and recharges it afterwards, while keeping enough stored electricity for your business.

3. Check the payments, responsibilities and setup

Agree your share of the payments, the aggregator’s fee and when you’ll receive the money. Ask for statements showing the methodology it will use to work out your payment and any deductions.

Check whether the aggregator can reduce your payment or charge you if:

  • Your battery can’t supply the agreed power.
  • A fault or maintenance makes it unavailable.
  • Meter readings are missing.
  • The equipment fails a required performance test.

Ask your aggregator how to report a battery fault or tell it about planned maintenance. It needs to know when your battery won’t be available.

Check how long you’re signing up for, whether you can leave early and what it would cost. Also ask what happens if you need to replace your battery during the agreement.

Your aggregator handles the application and registration. It should explain any tests it needs to carry out on your battery, when they’ll happen and whether they’ll affect your normal battery use.

What other electricity markets and flexibility services are available?

The wider flexibility market offers other ways for you to earn from your battery. Which ones you can access depends on your equipment, meter, contracts and grid connection.

  • Local flexibility markets: Your local network operator can pay you to take more or less electricity from the grid, or supply electricity, where this eases pressure on its network.
  • Demand Flexibility Service: NESO pays for taking more or less electricity from the grid during agreed events.
  • Balancing Mechanism: Your aggregator offers to increase or reduce your grid use at short notice, then arranges the work if NESO accepts.
  • Frequency response services: NESO pays for keeping battery power available, with controls automatically adjusting charging or discharging as grid frequency rises or falls.
  • Reserve services: You can receive payments for keeping battery power available and for supplying electricity or taking more or less from the grid when NESO instructs.
  • Wholesale electricity market: Your aggregator can sell electricity from your battery when the price is high enough to cover the costs and make the trade worthwhile.

Where can GridVolt help?

If you already have a solar + battery or battery-only setup in Great Britain, GridVolt can look at how you use it and where there may be opportunities to earn more.

Keeping electricity available for the Capacity Market needs to work alongside running your business and saving on your bills. We’ll look at what you need from your battery and explain which options we can offer through GridTrade.

Our Energy Manager software plans when compatible batteries charge and supply your building, using your electricity prices, business needs and expected solar generation.

Fill out the form on the right or contact GridVolt to talk through your setup.

Recommended links

Recommended links for installers